Descargar Imprimir esta página

GE AEV24 Serie Manual Del Propietario E Instrucciones De Instalación página 14

Publicidad

Idiomas disponibles

Idiomas disponibles

Window Installation Instructions
8
INSTALL THE AIR CONDITIONER
IN THE CASE
Make sure the ground
A
wire is off to the side
and slide the air
conditioner into the
case. Do not push
on the controls or the
finned coils. Make
sure the air
conditioner is
firmly seated.
Reinstall the locking bracket and screw
B
removed earlier.
Reconnect the ground wire to the air
C
conditioner using the screw removed earlier.
IMPORTANT: The ground wire must be
reinstalled to ensure a proper ground.
Remove the front grille from its box and
D
remove the shipping tape.
Grasp the inlet grille at the bottom corners
E
and pull it forward. Unhook it from its top
hinges and set it aside.
Using the tab, pull up slightly on the filter
F
to release it and pull it down and out.
8
INSTALL THE AIR CONDITIONER
IN THE CASE
Pull the coiled power cord from its shipped
G
position in the air discharge area. Attach
the front grille frame to the case by inserting
the tabs on the grille frame into the slots
on the front top of the case.
Guide the lever carefully
through the grille frame
as you push it in.
Press the grille frame in around the power
H
cord on the right side. Secure the grille with
a type F (painted) screw on each side and a
type C screw in the front.
Type F
screw
Reinstall the filter.
I
Reinstall the inlet grille. Connect power.
J
Caulk or weather-strip any gaps or openings
to the outside to seal the installation.
14
(cont.)
Type F
screw
Type C screw

Publicidad

loading

Este manual también es adecuado para:

Aeq24 serieAeh24 serieAew24 serieAew24dkAeh24dk