Descargar Imprimir esta página

Palmako EL16-4228 Instrucciones De Montaje página 12

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 27
Installation manual - English
B. Hard surface installation
When installing the house on a hard surface, use pillar legs (4 pcs), Art. 73808 (manufactured from structural
steel S235, material thickness at least 2 mm).
NB! The pillar legs are not included in the supplied kit!
Put the pillar legs on the pillar ends and shift the house to the desired place. Drill holes in the base surface and
attach the pillar shoes with wedge anchors. Drill holes in the wooden pillars and attach with bolts.
NB! When installing the house on a hard surface, to reduce fall hazard you should fill the surface under and
around the house with mulch or another soft material. You can also use special anti-impact mats designed for
playgrounds.
We wish you total success with the garden house installation and much joy
with this house for many years to come!

Publicidad

loading