Step 3: INSTALLATION
1. Hold the blower on the wall.
Note the direction of the air conduction.
2. Mark the 4 mounting boreholes.
•
At least one screw must be installed through a
stud.
•
All hardware must be suitable for the wall's
construction materials.
•
Ensure the air outlet points downward.
3. Wall break:
Mark and drill a guide hole and a separate hole for
electrical conduit.
4. Drill the 4 x ¼'' (6,3 mm) Ø mounting boreholes.
Insert wall anchors and screw the blower to the wall.
5. Connect the ducting from the blower to the extractor
hood and feed to the outside.
Page. 5
min. 40"
min. 40"
(101.5 cm)
(101.5 cm)
min. Ø 10½"
min. Ø 10½"
(267 mm)
(267 mm)
(394 mm)
(394 mm)
3
3
"
"
7 7
/
/
16
16
(183 mm)
(183 mm)
5
5
"
"
6 6
/
/
16
16
(160 mm)
(160 mm)
13
13
"
"
/
/
16
16
(21 mm)
(21 mm)
(540 mm)
(540 mm)
"
"
6 6
1
1
/
/
4
4
(159 mm)
(159 mm)
¾"
¾"
(19 mm)
(19 mm)
15½"
15½"
21¼"
21¼"