Descargar Imprimir esta página

Annovi Reverberi AR 125 bp Manual De Uso E Instalación página 33

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Safety recommendations for maintenance
Caution - Take Care
Before doing any maintenance work, depressurise the water system and isolate the pump from all en-
ergy sources.
When the jobs are done, before restarting the pump, check that no tools, rags or other materials have
been left close to moving parts or in hazardous zones.
Replace any excessively worn components with original parts and use the lubricants recommended by
the manufacturer.
Frequency
Every working day
Every 100 working
hours
Dispose of the worn-out components and lubricants in accordance with the relevant statutory require-
ments.
Carry out the routine maintenance procedures specified by the manufacturer to keep the pump safe
and performing well.
English language
MAINTENANCE INSTRUCTIONS
Scheduled maintenance table
Component
Filter
Pump
Connection of pump to power
source (pulley, belt, coupling)
Pump
Pipes and connections
Pressure accumulator (if in-
stalled)
Reduction gear (if installed)
Procedure
Inspect filter cartridge
Checking the oil level
Inspection
Inspect mounting
Inspection
Check inflation pres-
sure
Check oil
33
7
Reference
See "Inspecting the
filter"
See "Checking the oil
level"
-
See "Inspecting the
pump mounting"
See "Inspecting the
connections and pipes"
See "Checking the
inflation pressure"
See "Checking the oil
level"
Use and Installation

Publicidad

loading

Este manual también es adecuado para:

Ar 145 bp