Descargar Imprimir esta página

GreenWorks Commercial GS181 Manual Del Operador página 12

Publicidad

Idiomas disponibles

Idiomas disponibles

EN
36
37
When the log is held on two ends (37):
1. Cut the first time 1/3 of the diameter from the top (36).
2. Cut the second time lower 2/3 from the bottom to
complete the bucking (35).
39
38
When the log is on a slope:
1. Stand on the uphill side.
2. Control the chainsaw completely.
3. Hold the chainsaw handles tightly.
4. Release the cutting pressure near the end of the cut.
When bucking is complete (38):
1. Wait for the chain to stop (39).
2. Ensure the chainsaw is turned off.
3. Check for hazards before you move to another tree.
10
MAINTENANCE
Do not let brake fluids, gasoline, petroleum-based materials
touch the plastic parts. Chemicals can cause damage to the
plastic, and make the plastic unserviceable.
Do not use strong solvents or detergents on the plastic
housing or components.
35
CAUTION
CAUTION
English
Remove the battery pack from the machine before
maintenance.
10.1
ADJUST THE CHAIN TENSION
The more you use a chain the longer it becomes. It is
therefore important to adjust the chain regularly to take up the
slack.
Tension the chain so that it can only just be pulled away from
the bar at its centre point.
A slack chain may jump off and cause serious or even fatal
injury.
Wear protective gloves if you touch the chain, bar or areas
around the chain.
1. Stop the machine.
2. Loosen the lock nuts with the wrench.
It is not necessary to remove the chain cover to adjust the
chain tension.
3. Turn the chain adjustment screw clockwise to increase
the chain tension.
4. Turn the chain adjustment screw counterclockwise to
decrease the chain tension.
5. When the chain is at the wanted tension, tighten the lock
nuts.
12
WARNING
WARNING
CAUTION
NOTE

Publicidad

loading

Este manual también es adecuado para:

Csb404