30" DUAL FUEL SLIDE-IN RANGE INSTALLATION INSTRUCTIONS
To avoid breakage: Do NOT handle or
manipulate the unit by the cooktop.
The counter-top around the cut-out should be flat and
1
leveled (see hatched area on illustration 1).
Before installing the unit, measure the heights of the two (2)
2
cabinet sides (H1-4), front and back (see illustration 1) from the
floor to the top of the counter.
Level the range using the
four (4) leveling legs, so
that the height from the
floor to the underside
3
of the metal flange is
greater than the tallest
cabinet measurement by
at least 1/16" (see illustration 2).
Slide the unit into the cabinet. Make sure the
4
center of the unit is aligned with the center of the
cabinet cut-out.
Remove the protective channels on each side of the cooktop
5
(if provided).
The metal flange under each side of the cooktop MUST be
placed over the cabinet countertop for proper unit support.
6
The cooktop should NOT rest directly on the countertop (see
illustration 2) or else it could cause damage to the cooktop
voiding the warranty. Level the unit if needed.
After the installation, MAKE SURE that
the unit is supported by the two front
8
7
leveling legs and the two adjustable
leveling wheels and NOT by the
cooktop.
All manuals and user guides at all-guides.com
(Models with an Electric Oven and a Gas Cooktop)
1 ½" Max.
Shave
(3.8 cm Max.)
Raised
Edge
to Clear
Space for a
31½" (81 cm)
Wide Cooktop.
H1
Illustration 1
3
H2
H4
H3
To successfully
install the range,
the initial level
height from floor
to underside of
cooktop frame
should be at least
1/16" taller than
cabinet sides as
measured in step
2.
Illustration 2