Descargar Imprimir esta página

GreenWorks Pro BPB60L02 Manual Del Operador página 8

Publicidad

Idiomas disponibles

Idiomas disponibles

EN
2. Turn the rear blower tube in the direction of the slot until
the tabs lock into position.
Put the cord in the cord retainer.
10.5
INSTALL THE FRONT BLOWER
TUBE
4
1. Align the grooves on the front blower tube (4) with the
tabs on the rear blower tube (5).
2. Install the front blower tube onto the rear blower tube
until the tabs engage the grooves.
3. Turn the front blower tube in the direction of the slot until
the tabs lock into position.
WARNING
5
English
The front tube has two fixed positions. You can adjust the
length of the tube according to different needs.
10.6
INSTALL THE BATTERY PACK
If the battery pack or charger is damaged, replace the
battery pack or the charger.
Stop the machine and wait until the motor stops before
you install or remove the battery pack.
Read, know, and do the instructions in the battery and
charger manual.
1. Align the lift ribs on the battery pack with the grooves in
the battery compartment.
2. Push the battery pack into the battery compartment until
the battery pack locks into place.
3. When you hear a click, the battery pack is installed.
10.7
REMOVE THE BATTERY PACK
1. Push and hold the battery release button.
2. Remove the battery pack from the machine.
10.8
ADJUST THE HARNESS
1. Fit the backpack on your back.
2. Pull the ends of the straps down to tighten the harness.
3. Connect the horizontal chest strap.
4. Pull the end of the chest strap to tighten.
8
NOTE
WARNING
7

Publicidad

loading

Este manual también es adecuado para:

Bpb60l512