IMPORTANT NOTE: The manifold comes with a RELIEF VALVE built in. If a hissing sound is heard, the valve is
1. Turn red shut–off knob A, on manifold (3), clockwise to closed position.
2. Fill tank through valve B on side of manifold. IMPORTANT: NEVER exceed 135 PSI.
3. For operation turn red knob A counter–clockwise to open position.
4. Close red shut-off knob A when not in use.
Item
Part No.
1
E100179
2
E104701
3
E100177
IMPORTANT: Before reassembling any parts to the tank or manifold, apply sealant or Teflon® tape to threads.
OPERATING INSTRUCTIONS
probably bleeding off excess air pressure in the tank.
RISK OF BURSTING. MAXIMUM tank pressure—135 PSI.
RISK OF BURSTING. Rust weakens tank, may cause explosion and severe or fatal
injury/property damage. After each inflation, drain all moisture from tank by inverting tank
and depressing fill valve.
RISK OF INJURY. Fill with compressed air only.
RISK OF INJURY. Deflate before removing fittings.
Qty
1
1
1
Disable and discard tank 5 years from date on tank foot (C) .
Description
Gauge, 0-200 PSI
Hose, 4 ft. with air chuck
Manifold
3 - ENG