Control channel 2 - Gobo-wheel, gobo-shake
DMX-value Feature
0-5
Blackout
6-31
Strobe-effect
32-41
Open
42-52
Gobo 1
53-63
Gobo 2
64-73
Gobo 3
74-84
Gobo 4
85-95
Gobo 5
96-105
Gobo 6
106-116
Gobo 7
117-127
Gobo 8
128-137
Gobo 9
138-147
Open
148-155
Gobo 1 shake with increasing speed
156-163
Gobo 2 shake with increasing speed
164-171
Gobo 3 shake with increasing speed
172-179
Gobo 4 shake with increasing speed
180-187
Gobo 5 shake with increasing speed
188-195
Gobo 6 shake with increasing speed
196-203
Gobo 7 shake with increasing speed
204-210
Gobo 8 shake with increasing speed
211-217
Gobo 9 shake with increasing speed
218-223
Sound-controlled
224-225
Open
226-255
Cont. gobo-wheel rotation with increasing speed
Control channel 3 - Dimmer intensity
DMX-value
Feature
0-255
Gradual adjustment of the dimmer intensity from 0 to 100 %
The operator has to make sure that safety-relating and machine-technical installations are inspected by an
expert after every four years in the course of an acceptance test.
The operator has to make sure that safety-relating and machine-technical installations are inspected by a
skilled person once a year.
The following points have to be considered during the inspection:
1) All screws used for installing the devices or parts of the device have to be tighly connected and must not
be corroded.
2) There must not be any deformations on housings, fixations and installation spots (ceiling, suspension,
trussing).
3) Mechanically moved parts like axles, eyes and others must not show any traces of wearing (e.g. material
abrading or damages) and must not rotate with unbalances.
4) The electric power supply cables must not show any damages, material fatigue (e.g. porous cables) or
sediments. Further instructions depending on the installation spot and usage have to be adhered by a
skilled installer and any safety problems have to be removed.
We recommend a frequent cleaning of the device. Please use a moist, lint-free cloth. Never use alcohol or
solvents!
DANGER TO LIFE!
Disconnect from mains before starting maintenance operation!
27/55
51785855_V_1_3.DOC