Descargar Imprimir esta página

Gude GKM 100.1 Traduccion Del Manual De Instrucciones Originale página 42

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 91
ENGLISH
38
Inspection and maintenance plan
Regular servicing period
Engine oil
Inspection
(10W-40)
max. 0,5 l
Change
Spark plug
Inspection
Clean
Change
Air filter
Inspection
Clean
Change
Check the petrol level
Drain the petrol tank
Check the screwed connec-
tion
Check the cables
Lubricate the pivot points
Check the cooling
Clean the machine tho-
roughly. Spray the skids and
plough with oil
Provide appropriate servicing upon the earlier of the following: in the given month or after the specified hours of opera-
tion have expired.
Before
After 1
any start-
month
up
20
Hours of
operation
After 3
After 6
months
months
50 Hours
100 Hours
300 Hours
of opera-
of opera-
tion
tion
After 12
At the
months
end
of the
season
of opera-
tion

Publicidad

loading

Este manual también es adecuado para:

16841