fadini HINDI 880 - evo Manual De Instrucciones página 17

Ocultar thumbs Ver también para HINDI 880 - evo:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

HINDI 880 - evo
PREPARING THE FIXING PLATES
First weld the front and rear fixing plates to the patching plates (Pic. 5), after assessing the installation measurements as indicated
in Pic. 6 and Pic. 7 (or in Pic. 8, in the case where opening is required to be outwards).
Reinforcement patching plate
installations, it is recommended
to provide a plate adequate to the
This distance
depends on B
(Pic. 7 and Pic. 8)
IMPORTANT: in case of heavy gates, it is recommended that
!
fixing to the gate post and gate leaf be stronger by providing
rigid patching plates (not supplied by the manufacturer).
Misalignment between post- and gate-fixings, measured from the fixing centers:
21 mm
35 mm
FIXING GEOMETRY FOR THE GATE TO OPEN INWARDS
Fixing distances for 95° opening
stroke (mm)
150
280 (non braking)
280 (braking)
400 (non braking)
400 (braking)
It is always recommended, before the operator fixing is finally completed, that a few manual
!
tests be carried out with Hindi 880-evo to assess that the installation distances are correct.
universal oil-hydraulic operator for swing gates
(optional). With heavy
gate type.
HINDI 880-evo: stroke 150 and 280 mm
HINDI 880-evo: stroke 400 mm
A
A
B
60
80
130
130
120
130
210
180
200
160
Make sure the operator
is levelled in all
directions before fixing it
Rear fixing
80 (with 150 and 280 mm strokes)
100 (with 400 mm stroke)
Fixing distances for 120° opening
stroke (mm)
280 (non braking)
280 (braking)
400 (non braking)
400 (braking)
17
Front
WARNING:
fixing
if any welding is carried
out to complete the front
fixing with Hindi 880-evo
installed,
make sure the shaft is
suitably protected.
Closed position
gate stop
A
B
130
85
130
80
190
120
200
90
!
Pic. 5
Pic. 6
Pic. 7

Publicidad

Tabla de contenido
loading

Productos relacionados para fadini HINDI 880 - evo

Tabla de contenido