7
Commissioning
7.1
Personnel qualifications
7.2
Operator's obligations
7.3
Rotation control
Fig. 10: Correct direction of rotation
7.4
Operation in an explosive atmos-
phere
Approval according to
ATEX
Installation and operating instructions Wilo-Flumen OPTI-TR 20-1, 22, 28-1, 30-1, 40-1, Wilo-Flumen EXCEL-TRE 20, 30, 40
Commissioning
NOTICE
Automatic activation after power cut
Depending on the process, the product is activated and deactivated using separate con-
trols. The product may automatically activate following power cuts.
ƒ
Operation/control: Operating personnel, instructed in the functioning of the complete
system
ƒ
Provide installation and operating instructions by the mixer or at a place specially re-
served for it.
ƒ
Make the installation and operating instructions available in a language the personnel can
understand.
ƒ
Make sure that the installation and operating instructions are read and understood by all
personnel.
ƒ
All safety devices and emergency cut-outs on the system-side must be active and
checked to ensure that they work properly.
ƒ
The mixer is suitable for use under the specified operating conditions.
The mixer is checked at the factory and set to the correct direction of rotation for a clock-
wise rotating field. The connection is made according to the information in the "Electrical
connection" section.
Checking the direction of rotation
‡
Mains connection with clockwise rotating field present.
‡
Rotating field inspected by a qualified electrician.
‡
No persons are allowed in the working area of the mixer.
‡
Mixer firmly installed.
WARNING! Do not touch mixer with hands! The high starting torque can lead to seri-
ous injuries!
‡
Propeller is visible.
1. Switch mixer on. Max. operating duration: 15 s!
2. Direction of propeller rotation:
View from front: The propeller rotates counter-clockwise (to the left).
View from behind: The propeller rotates clockwise (to the right).
▶ Direction of rotation is correct.
Incorrect direction of rotation
If the direction of rotation is incorrect change the connection as follows:
ƒ
Direct starting: swap two phases.
ƒ
Star-delta starting: swap connections of two windings (e.g. U1/V1 and U2/V2).
NOTICE! After changing this connection, check the direction of rotation again!
o
o
o
o
o
o