Descargar Imprimir esta página

Westinghouse ETL-ES-Alloy-WH21 Manual Del Usuario página 9

Publicidad

OPCIÓN CON VARILLA VERTICAL PARA TECHO NORMAL
6
Loosen (but do not remove) the set screws from the down rod coupling.
Place down rod assembly into canopy and coupling cover. Place downrod
assembly (1) into canopy (2) and coupling cover (3).Feed motor wires though the
downrod assembly (1).
Afloje (pero no quite) los tornillos de fijación del acoplamiento de la varilla
vertical. Coloque el conjunto de la varilla vertical (1) dentro del dosel (2) y la
cubierta del acoplamiento (3).Pase los cables del motor a través del conjunto de
la varilla vertical (1).
NORMAL DOWNROD OPTION
1
2
3
Insert downrod into downrod coupling. Make sure to align hole in downrod with the hole in down-
rod coupling. Install cross pin (1) through coupling and downrod. Insert keeper pin (2) into cross pin
until it snaps into place. Tighten set screws (3) in coupling. Slide coupling cover (4) over the downrod
coupling. PROCEEDTO PAGE 12, STEP 11.
Inserte la varilla vertical en el acoplamiento de la varilla vertical. Asegúrese de que el agujero de la
varilla vertical y el del acoplamiento de la varilla vertical estén alineados. Instale el pasador trans-
versal (1) pasándolo por el acoplamiento y la varilla vertical. Inserte el pasador de retención (2) en el
pasador transversal hasta que escuche un chasquido que indique que está en la posición adecuada.
Ajuste los tornillos de fijación (3) en el acoplamiento. Deslice la cubierta del acoplamiento (4) sobre
el acoplamiento de la varilla vertical. PROCEDA A LA PÁG. 12, PASO 11.
7
2
1
9
ETL-ES-Alloy-WH21
3
4

Publicidad

loading

Este manual también es adecuado para:

Alloy