LVI Oslo IR Instrucciones De Montaje Y Uso página 14

Ocultar thumbs Ver también para Oslo IR:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 15
ENGLISH
STANDARDS
Class II
Electric towel radiators comply with the standards EN 60.335-1, 60.335.2.30, 60.335.2.43. These towel radiators benefit from class II double
insulation on the electric parts and are protected against splashing. They also comply with European Directive 89/336/CEE (CE mark on all
radiators).
LOCATION
Towel radiators must be installed according to professional
standards.
They can be installed in the second part of the bathroom, making
sure that each control (button, switch) cannot be reached by
anyone using the bath or shower.
The bottom of the control unit must be at a minimum distance of
150 mm from the floor.
The radiator must not be installed less than 50 mm from a wall or
underneath a power socket.
CONNECTION
Electricity
The radiator is designed for a monophase current of
230-240 V~ - 50Hz.
The radiator must be connected to a cable outlet terminal strip
according to current electrical standards.
The original supply cable must be connected to the mains via a
connection box, which must be placed behind the radiator,
without a power socket in between and which will be situated at
least 25 cm from the floor.
Neutral: Grey wire - Phase: brown wire (or other colour)
– Control wire: black wire (no control wire on the infrared
control unit). The control wire allows the temperature to be
reduced if it is connected to a specific programmer. It must never
be connected to earth and must be isolated from any contact if it
is not used.
If the supply cable is damaged, it must be replaced by a specific
cable. This cable must be replaced by the manufacturer, their
after-sales service or similarly qualified people, in order to avoid
danger.
The towel radiator is filled with a precise quantity of heating fluid.
Repairs requiring the opening of the bathroom radiator may
only be done by the manufacturer or their after-sales service, who
must be contacted if the heating fluid leaks.
According to professional standards an all-pole cut-out device
is obligatory. The distance separating the contacts must be at least
3 mm.
If installed in a bathroom or shower room, the towel radiator
must be protected by a differential circuit breaker of 30 mA
maximum.
If the radiator is scrapped, the heating fluid may only be disposed
of by approved sub-contractors.
WARRANTY
The radiator is currently backed by a 5-year warranty. Please contact
the manufacturer or an authorised electrician if you have any
problems or need any repair work to be carried out.
THERMOSTAT INSTRUCTIONS
Please see separate page.
INSTALLATION OSLO IR
The apparatus must be installed on a vertical wall using the wall
mounts supplied. Suitable screws and plugs are included.
The apparatus' mounting components are adjustable vertically,
horizontally and as regards depth (see exploded diagram in the box),
which makes correct installation easier. Positioning can be seen from
the figure on the drawing page.
Start by screwing the two upper wall mounts securely into the wall.
(The distance between the mounts can be seen from the figure on
the drawing page.) Ensure that the mounts are horizontal. Install two
clamps between the highest and second-highest horizontal tubes.
Screw in the outer clamp so that the holder is loosely clamped
between the tubes.
- IP 44 - IK09 -
Install the clamps between the lowest and second-lowest tubes.
Screw in the outer clamp and provisionally install it on the loose wall
mounts.
Hang up the apparatus by inserting the upper holder pins in the
upper wall mounts.
Check that the apparatus is vertical and centred.
If necessary adjust by moving the towel drier sideways or by adjusting
the wall mounts, which are also adjustable.
Temporarily tighten the upper mounts in order to mark the location
of the lower wall mounts on the wall.
Remove the apparatus again and screw the lower wall mounts
securely into the wall (according to the wall markings).
Hang the apparatus in all the holder pins and finally tighten all the
screws.
The apparatus can also be adjusted as regards depth. Also tighten
the screws.
Check that the apparatus is hanging correctly, otherwise readjust.
Press the cover plates into position on the front to hide the screws.
INSTALLATION PARIS IR
The apparatus must be installed on a vertical wall using the wall
mounts supplied. Suitable screws and plugs are included.
The apparatus' mounting components are adjustable vertically,
horizontally and as regards depth (see exploded diagram in the box),
which makes correct installation easier. Positioning can be seen from
the figure on the drawing page. Start by marking out the four holes
on the wall.
Screw the two upper wall mounts securely into the wall. (The
distance between the mounts can be seen from the figure on the
drawing page.) Ensure that the mounts are horizontal.
Insert the upper holder pins in the upper wall mounts, then hang the
apparatus. Check that the apparatus is vertical, otherwise adjust the
wall mounts.
Temporarily tighten the upper mounts in order to check the
markings on the wall for the location of the lower wall mounts. If
necessary adjust the markings.
Remove the apparatus again and screw the lower wall mounts
securely into the wall (according to the wall markings).
Hang the apparatus in all the holder pins and adjust the depth, if
necessary. Finally tighten the screws.
Check that the apparatus is hanging correctly, otherwise readjust.
Pull out the cover cylinders towards the apparatus in order to hide
the holder pins and secure the apparatus. Then tighten the screws.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Paris ir

Tabla de contenido