Descargar Imprimir esta página

Viesta VSD35FS Instrucciones De Uso Originales página 2

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

KEN001VSD
EN
VSD35FS SOLAR SHOWER INSTRUCTIONS
Fig. 1
ASSEMBLING INSTRUCTIONS
1. Choose a location for shower which will receive as much
sunlight as possible.
2. Mount the shower base to concrete slab or wood base with
four bolts and nuts. We recommend using a wrench. Fig. 1
3. Attach shower head to extension pipe, then connect
extension pipe to shower upper tube with adjust nut.
We don't recommend use wrench. Fig. 2
NOTE: Don't forget gasket when connecting shower head
and extension pipe.
4. Put O-ring on the slot of lower tube. Fig. 3
5. Lift shower upper tube on lower tube. Fig. 3
6. Turn locking ring clockwise to securely connect upper tube to
lower tube. Fig. 3
NOTE: Handle and shower head need to face the same
direction.
INITIAL SET UP OF THE SHOWER
1. Turn handle to FULL ON HOT position.
NOTE: Filling water with handle on "full on hot" position
ensures no air pockets are trapped in the shower.
2. Attach garden hose to hose connector. Turn on water supply
to garden hose to fill the shower.
It will take 4 to 6 minutes to fill up the shower.
3. When water flows from the shower head, turn the handle off.
Turning the handle off makes water start heating in the tubes.
4. Depending on available sunlight and outside temperature,
the shower will take about two hours to fully heat water.
5. Water temperature in shower can reach 60ºC in strong
sunshine.
All manuals and user guides at all-guidesbox.com
Fig. 2
2
Fig. 3
Version: 1.0
20.01.2020
Extension pipe
Gasket
Shower head
Adjust nut
Upper tube
0 ring
Locking ring
Handle
Lower Tube
Adjust nut
Foot washer
Gasket
Hose connector
Bolts
Washers
Nuts

Publicidad

loading