Descargar Imprimir esta página

Siemens DKE 645 Instrucciones De Uso Y De Montaje página 24

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 57
Installation
08. Screw in the two lower hexagon head
cap screws.
Before the 4 screws are tightened
down, align the extractor hood properly.
09. Connect up the air outlet pipe.
10. Connect the hood to the electricity
supply.
24
11. Remove the protective film from the
two flue ducts.
Take care not to damage the
surfaces which are susceptible to
scratches etc.
12. Push both sections of the flue panelling
together (slots in the upper section
must be pointing downwards) and
insert into the opening in the extractor
hood.
Protect the cover panels from
scratches, for example by laying the
template used for marking the wall over
the top edge of the lower section.
3.
1.
13. Slide out the upper section and attach
it to the mounting brackets at the sides
with two screws.
14. Insert the grease filter (refer to
Operating Instructions).
2.

Publicidad

loading

Este manual también es adecuado para:

Dke 945 e