Descargar Imprimir esta página

Celexon Leinwand Rollo Economy Manual De Instrucciones página 13

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 25
IN THE BOX
1x Screen
4x Plastic dowel
4 x Screws
4 x Ceiling loops
4x washers
4x Nuts
INSTALLATION NOTES
Install the screen in a position that is fully visible to all viewers! The optimum
installation height corresponds to the position of the viewers in the centre of
the screen with the screen fabric extended: eye level = lower third of the screen
surface.
The screen can be installed on the wall/ceiling or hung from the ceiling on
hooks (the eyelets are already on the side cap). For wall or ceiling installation
only, the eyelets should be removed in advance). Please make sure that the me-
tal shims are also used for wall and ceiling mounting, otherwise safe installation
cannot be guaranteed).
The enclosed installation material is intended for a solid stone wall. If neces-
sary, obtain suitable mounting material for your installation surface.
CEILING MOUNTING (VIA EYELETS)
Attach the eyelets to the two side caps and measure the distance between
them.Mark the points on the ceiling and make sure that the eyelets are aligned
with each other and parallel to the wall. Pre-drill the holes at the markings with
the right diameter drill bit for the hooks and mounting material, fix them to the
ceiling and hang the screen.
4

Publicidad

loading