Operation Introduction - Facula XEO Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

7. Operation Introduction

Before starting operations in this section:
1. Find a place where there is power supply nearby.
2. As shown in Fig.5 and Fig.5a, install the exhaust hose, and adjust the window position well.
Fig. 5
3. Connect drain hose well (only for using heating model);
4. Insert the power cord into an grounded AC220~240V/50Hz socket;
5. Press the POWER button to turn on the air-conditioner.
• •
1
Fig. 6
26
Fig. 5a
Dranaige outlet

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Acpx34

Tabla de contenido