8.3.4. Proxy configuration.
On this screen, a proxy server is configured.
8.3.5. NTP servers.
If you want to modify the NTP server on the card, do so in this
section. By default, it is configured with the pool.ntp.org servers.
8.3.6. Manager Settings.
Available for Engineer or Administrator users only. This screen
allows you to view the initialisation of the meter, make a single
reading of the voltages, currents and powers of the connection,
view/scan the number of Inverters installed and configure the con-
trol parameters, such as Zero Injection.
82
Parameter
Status
The Meter has initialised correctly.
The Meter has NOT initialised correctly.
Correct Meter
This fault occurs when the AC power supply
Initialisation
to the Energy Manager has two phases
X
inverted.
Check the wiring of the AC power supply
cables.
If the number of inverters found does not
Scan Inverters
N/A
correspond to the number of inverters
installed, force a scan.
Zero Injection Control Disabled (default).
Zero Injection Control Enabled. Depending
on the installation, it does not need to be
Enable Zero Injection
enabled.
Before enabling the Zero Injection Control,
make sure that the Power measurements
are correct.
Description