EN
IMPORTANT ASSEMBLY STEPS
When encountering this information icon during assembly,
please refer the relevant assembly step for important
additional comments.
Step 1:
Door assembly can be done from the right or left hand side.
Determine which side to place the door.
The decision will affect the upcoming steps.
Steps 1-3:
Arrange all 2D connectors with the stamped word OUT facing
the outside of the greenhouse.
Step 4:
Make sure that the frame is perfectly rectilinear by measuring the
diagonals and verifying that they are the same.
Make sure that the frame is level and anchor it with screw / screw +
dibble / spike (not included) according to the selected surface.
The wall to which you are securing your product onto must be at
a 90° to the foundation.
Step 17:
Make sure that the frame is perfectly straightened by using a spirit level.
Make sure that the frame is leveled and anchor it to the wall with
suitable screws / screws + plugs / spikes (not supplied,
excluding part # BC1) in accordance with your wall surface.
The wall to which you are securing your product onto must be at
a 90° to the foundation.
Reinforcement Arch Profiles
Steps 18-23:
Make sure that all the metal profiles are inserted inside the
plastic profiles.
Repeat each step based on your product's size and the number of
arch profiles needed to be assembled as illustrated.
Step 27:
Make sure that the profiles are perfectly straightened by using a
spirit level.
Anchor Part 7937 to the wall with suitable screws / screws + plugs /
spikes (not supplied) according to your wall surface.
Step 28:
Repeat Steps 24-27 according to the amount of modules purchased.
Step 30:
Repeat and refer to Step 4.
Steps 39-40:
Repeat and refer to Step 17.
Step 41:
Seal the product's edges with Silicon Sealant.
Step 57:
Insert the rubber strip (Part GF) from the outside of the product.
Cut the remaining edges.
Step 64:
Insert the rubber strip, Part 7869, from the outside of the product.
During this step, turn the door in order to insert the rubber strip correctly.
Step 66:
Determines door opening's direction. The door can be installed as a left
or right hand door and can be opened either to the left or to the right.
Step 69:
Adjust the hinges height in accordance with the upper post and lower
ramp of the door aperture, as specified in Illustracion c.
Step 70:
If necessary, you can rotate the cylinder tab. See Drawings a + b.
Step 75:
If the window doesn't close properly, please release the screws,
adjust the profile and re-tighten the screws.
Step 76:
The door can be installed either as a right or left hand door.
Choose one of the two depicted options.
* If you choose the option of the door openeing to the wall,
use suitable screws and plugs for your wall type.