4' Rubber Fill Hose 2 Pack
5304473845
Paquete de 2 mangueras de llenado de caucho de 4'
Paquet de 2 tuyaux de remplissage en caoutchouc de 4 pi
Installation
1. Run some water from the hot and cold faucets to flush the
water lines and remove particles that might clog the water
valve screens and to determine which faucet is hot and
which is cold supply. (Fig. 1).
2. Check to ensure the inlet hoses have the rubber washer
firmly in place. (Fig. 2).
3. Connect the HOT inlet hose (color: red) to the HOT inlet
connection on the washer and the COLD inlet hose to the
COLD inlet connection (color: blue) on the washer. (Fig. 3).
Cold
Fig. 1
Fig.2
Hot
Fig. 3
4. Tighten by hand until snug. Then tighten each supply
connection another 2/3 turn with pliers. Do not cross thread
or overtighten these connections. (Fig. 4).
5. Connect the HOT inlet hose to the HOT water supply and the
COLD inlet hose to the COLD water supply. (Fig 5).
6. Tighten by hand until snug. Then tighten each supply
connection another 2/3 turn with pliers. Do not bend, kink or
pinch water inlet hoses. (Fig. 6).
7. Turn on the water and check for leaks. (Fig. 7).
The water supply pressure must be between 14.5 PSI and 116 PSI.
If the water supply pressure is more than 116 PSI, you must install
a pressure reducing valve. NOTE: The washer requires both a hot
and a cold water supply to be attached. The water supply for the
hot water valve should be at least 120˚F.
Replace water supply hoses every 2 to 3 years.
Fig. 4
Fig. 5
Fig. 6
Fig. 7
5304473845 (August 2022)