1
Determine location for float switch.
Switch plug
Pump plug
3
Adjust pumping range.
lift rod
float
float stop
Activation level
Pumping range
2
Secure float switch to discharge pipe by inserting
the hose clamp through the mounting bracket
slots and tightening the hose clamp.
Hose clamp
4
For units without plugs, connect wires as shown.
In 230 VAC installations, one side of the line
going to the load is always HOT. This condition
exists if the switch is on or off. Install double pole
disconnect on all 230 VAC circuits. Ensure cable
connections are performed in a dry junction box or
other watertight seal that seals both conductors
and cable jacket. Failure to do so could result in
electrical shock hazard and/or water traveling down cable and
entering the switch. Failure to guard against this may affect switch
performance.
5
Test unit after installation to ensure proper
operation.
Mounting bracket