Descargar Imprimir esta página

Palmako FR44-4735-2 Manual De Montaje página 10

Ocultar thumbs Ver también para FR44-4735-2:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 29
Installation manual – English
ATTENTION: It is not necessary to fix the doors and windows to the wall logs! If you wish to do this, it
will be sufficient to fix them with a couple of screws in the lower part of the frame because as they dry,
the wall logs will begin subsiding.
You can conduct the final adjustments of the doors and windows only some 2-3 weeks after the house
installation, when the house will have become adapted to weather conditions and its logs settled.
Apex
In most cases, the apex is supplied in one piece (attention: in some house options, the apex can comprise
several parts! In this case, these parts will have to be screwed together prior to other actions). Having installed
the last wall logs, place the apex on the front and back walls and attach them with screws.
The apexes have indents for the purlins. The purlins also have the corresponding indents, ensuring that the
roof is placed firmly and in the right place.
Now place the purlins
corresponding
indents
apexes.
Make sure that the upper wall log,
apexes
and
purlins
Having fitted the purlins, screw
them onto the apex from above.
ATTENTION: If the wall logs are not properly pressed on top of one another without gaps, the upper wall log
may not be on the same level with the apexes. In this case you should tap the wall logs downwards as
necessary or plane the apex or sidewall log somewhat lower.
Roof
Before installing the roof boards, make sure that the house is completely level. Use the water-level to
check all walls.
ATTENTION: When placing the roof, use a stable ladder. Do not step on the roof as the structure is
suitable to sustain only an even load (snow, wind, etc.), and not a point load!
Begin the installation of the roof boards from the front edge of the roof. Tap the boards lightly and
attach them from above and below with nails to the purlins and upper wall log.
ATTENTION: Do not press the roof boards together too densely and you will avoid moisture-causing
bulging! Leave an interval of about 1 mm between the boards to allow for swelling.
During the whole process of installing the roof boards, make sure that their crest purlins coincide
and the eave sides of the boards extend at a uniform distance. Verify this with a rope or the lateral
eave lath that you may install for verification purposes.
The roof boards must be even with the purlin ends in front and behind. If necessary, saw both last
roof boards so narrow that they are even with the purlin ends.
in the
Installation of purlins:
in
the
are
level.

Publicidad

loading