Descargar Imprimir esta página

Price Pfister GT34-4NCC Instrucciones De Montaje página 5

Publicidad

Idiomas disponibles

Idiomas disponibles

15
15C
15A
15B
15D
15 MOUNTING HARDWARE INSTALLATION
From underneath sink, secure the faucet by placing the Metal Washer (15A) and
7
the Long Nut (
/
Hex.) (15B) onto the Mounting Post (15C). Make sure that
16
the bumps on the Metal Washer (15A) are facing up. Tighten using a flathead
screwdriver or an adjustable wrench until the faucet is firmly connected to the
sink. Secure connection by screwing the Setscrew (15D) onto the Long Nut
(15B). Do not over tighten!
16
16C
16A
16B
HOT
16 WATER SUPPLY LINES
Gently separate hot and cold Faucet Inlets (16A), approximately three inches
apart. Connect water Supply Lines (16B) to Faucet Inlets (16A). Hot water supply
line goes to hot inlet fitting indicated by red tag (16C). (Supply lines not included).
Follow manufacturer's instructions when installing supply lines.
ENGLISH
17
17 UNIT START UP
Turn on hot and cold water supplies, and check for leaks above and below the sink.
18
18 VALVE FUNCTION
By lifting the Lever Handle (18A) up, the valve will be activated allowing water to
flow. The water flow will increase by continuing to lift up the Lever Handle (18A).
By rotating the Lever Handle (18A) counterclockwise, the water temperature
will decreased to fully cold. By rotating the Lever Handle (18A) clockwise, the
water temperature will increased to fully hot.
Note: Flush faucet before turning on valve (see step 21).
19
16A
16B
COLD
19 SPOUT FUNCTION
The Spout (19A) can be rotated around the Faucet Body in any direction.
5
FAUCET FUNCTIONS
CLOSED
HOT
18A
COLD
19A
OPEN
18A

Publicidad

loading

Este manual también es adecuado para:

34 serieGt34-4nssGt34-1nccT34-3nss