Descargar Imprimir esta página

Lemeks Palmako FR44-4040-1 Instrucciones De Montaje, Instalación Y Mantenimiento página 21

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 40
Installation manual – English
Apex
In most cases, the apex is supplied in one piece (attention: in some house options, the apex can
comprise several parts! In this case, these parts will have to be screwed together prior to other
actions). Having installed the last wall logs, place the apex on the front and back walls and attach
them with screws.
The apexes have indents for the purlins. The purlins also have the corresponding indents, ensuring
that the roof is placed firmly and in the right place.
Now place the purlins in the
corresponding
indents
apexes.
Make sure that the upper wall log,
apexes
and
purlins
Having fitted the purlins, screw
them onto the apex from above.
ATTENTION: If the wall logs are not properly pressed on top of one another without gaps, the upper
wall log may not be on the same level with the apexes. In this case you should tap the wall logs
downwards as necessary or plane the apex or sidewall log somewhat lower.
Roof
Before installing the roof boards, make sure that the house is completely level. Use the water-level to
check all walls.
ATTENTION: When placing the roof, use a stable ladder. Do not step on the roof as the structure is
suitable to sustain only an even load (snow, wind, etc.), and not a point load!
Begin the installation of the roof boards from the front edge of the roof. Tap the boards lightly and
attach them from above and below with nails to the purlins and upper wall log.
ATTENTION: Do not press the roof boards together too densely and you will avoid moisture-causing
bulging! Leave an interval of about 1 mm between the boards to allow for swelling.
During the whole process of installing the roof boards, make sure that their crest purlins coincide
and the eave sides of the boards extend at a uniform distance. Verify this with a rope or the lateral
eave lath that you may install for verification purposes.
The roof boards must be even with the purlin ends in front and behind. If necessary, saw both last
roof boards so narrow that they are even with the purlin ends.
Installation of purlins:
in
the
are
level.

Publicidad

loading

Este manual también es adecuado para:

110707110709110710110708