Aparici SIE150N Manual Del Usuario Y Del Instalador página 20

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

ES_EN_FR_IT_PT 
5.- ELECTRICAL CONNECTIONS STANDARDS.
The electrical installation must fulfil the international standards
CEI 64-8. According to this standards, electrical appliances must be
installed following the below indications at bathrooms and WC:
1.- zone 0: Installation is totally forbidden at this area. It is also forbidden
at zone 1 if it is a prefabricated shower cabin.
2.- zones 1 and 2: IPX4 appliances with a wire which allows connections
1,2 m from shower vertical and with an additional RCS switch.
3.- zone 3: IPX1 appliances allowed.
4.- The earth connection of the water heaters is compulsory.
We recommend the installation of the water heaters at zone 3
(fig.- 5).
a) Bath tube
Zone 1
Zone 2
Zone 0
0.6m
a) Bath tube front view
Zone 2
Zone 1
2.25m
Zone 0
0.6m
b) Shower without shower plate
Zone 1
2.4m
Zone 2
Zona3
Zone 3
b) Shower
Zone 1
Zone 3
Zona0
2.4m
Fig. – 5
20
0.6m
0.6m
2.4m
Zone 2
2.25m
Zone 3
2.4m
0.6m

Hide quick links:

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Sie200n

Tabla de contenido