Descargar Imprimir esta página

Lemeks Palmako PA44-4242 Instrucciones De Montaje, Instalación Y Mantenimiento página 23

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 42
Installation manual - English
Door installation:
When the pavilion is installed, place the door leaves on the hinges. To open and close the door, fit the
separately packaged lock and handle. If necessary, regulate the door from the hinges. Clean the door glass
and fix the door bars.
Window installation:
Install the window similarly to the door. Additionally you need to install the window stops.
ADVICE: Definitely make sure that the windows and doors open in the proper direction. The doors open
from the inside to the outside. The windows of the pavilions also open to the outside (the window handles
are on the inside).
ATTENTION: It is not necessary to fix the doors and windows to the wall logs! If you wish to do this, it will
be sufficient to fix them with a couple of screws in the lower part of the frame because as they dry, the wall
logs will begin subsiding.
You can conduct the final adjustments of the doors and windows only some 2-3 weeks after the pavilion
installation, when the pavilion will have become adapted to weather conditions and its logs settled.
ATTENTION: Fix wooden bars for doors and windows using 3 x 16 mm screws!
Roof
Please notice that after assembling wall logs, all walls must be with equal height. After insuring the equal
height of the walls, part pos. 151 must be screwed (5x90 mm screw) to walls as shown on the drawing.
In case of pavilion PA44-5742 you must screw part pos. 151 and part pos. 152 (5x90 mm screw) to walls as
shown on the drawing.
At first attach both (triangle) halves of the roof (left and right side), using the 5x90 mm screws. This way, 8
triangle roof components are formed for pavilion PA44-4242. In case of pavilion PA44-5742 you will get 6
triangle and 4 trapeze roof components.
ATTENTION: Attach the roof shingles (not
included in house kit) to the roof elements before
installing the roof to the garden pavilion.
Have ready some boards with the length ca. 3.60
m for installing pavilion to support the roof
elements during installation. The installation of
roof elements is possible with 2 persons.
Place one roof element onto the rafter and support
the top of the element at the centre of the garden
pavilion with the help of the board. In case of
pavilion PA44-5742 start with the middle triangle
roof component.
Attach the roof element to the rafter with 5x90
screws as it is shown on the illustration beside.
The next element is assembled exactly the same
way. When installing the second element, see that
the edge and the top of the roof would remain on
the same height as those of the first element.

Publicidad

loading

Este manual también es adecuado para:

106185106186106188106187