Check Before Power On
No.
The product is firmly installed at a clean place that is well-ventilated and easy-to-
1
operate.
2
The DC, AC, and communication cables are connected correctly and securely.
3
Cable ties are intact, routed properly and evenly.
4
Unused ports and terminals are fitted using the waterproof caps.
The voltage and frequency at the connection point meet the inverter grid connection
5
requirements.
6
(Optional) SIM card is installed correctly and securely.
7
The electrical conduit holes are sealed.
LED Explanation
Indicator
Status
Check Item
The inverter is power on and in the standby mode.
The inverter is starting and in the self-check mode.
The inverter is in normal operation under grid-tied or off-grid
modes.
BACK-UP output overload.
A fault has occurred.
The inverter is powered off.
The grid is abnormal and the inverter is in off-grid mode.
The grid is normal and the inverter is in grid-tied mode.
BACK-UP is off.
The monitoring module of the inverter is resetting.
The inverter fails to connect with Termination.
Communication fault between Termination and Server.
The monitoring of the inverter operates well.
The monitoring module of the inverter has not been started
yet.