Descargar Imprimir esta página

Hayward Sheer 500 WFS512B6LED Manual Del Propietário página 14

Publicidad

Idiomas disponibles

Idiomas disponibles

Winterization
Follow the steps below for winterizing the waterfall. Note that in areas where a deep freeze can
occur, the waterfall should not be allowed to fill with water, as ice can damage the waterfall when
it expands.
1.
Completely drain water from the water supply line and the waterfall.
2.
Remove the deck lid and unlock the LED light. Lay it loosely in the waterfall.
3.
Replace the deck lid and reseal.
LED Light Replacement
Follow the steps below to replace the LED Light assembly in an existing installation.
1.
Remove power to the waterfall system.
2.
Completely drain water from the Watefall system.
3.
Disconnect light wires from the transformer/junction box.
4.
Remove deck lid and use the light installation tool to unlock the light from the waterfall.
5.
Remove the light and pull the cable through the waterfall unit.
6.
Install the new light by following the Electrical Wiring steps starting on page 7.
7.
Restore power to the light and turn it on to verify operation.
Part No.
GLXWFSORGKIT
GLXWFSKTTOOL
GLXWFSTANLID
GLXWFSWHTELID
GLXWFSGRYLID
GLXWFSDKGRYLID
GLXWFSBLKLID
13
USE ONLY HAYWARD GENUINE REPLACEMENT PARTS
Maintenance
Replacement Parts
Sheer W/Led Light Top & Bottom O-Rings (3 Each) Kit
Sheer W/Led Light Light Engine Inst. Tool And Ext. Tool Kit
Sheer W/Led Light Deck Lid & Collar Kit (Tan)
Sheer W/Led Light Deck Lid & Collar Kit (White)
Sheer W/Led Light Deck Lid & Collar Kit (Gray)
Sheer W/Led Light Deck Lid & Collar Kit (Dark Gray)
Sheer W/Led Light Deck Lid & Collar Kit (Black)
Description

Publicidad

loading