3.
2.
4.
4 mm
3.
1.
5 mm
English
Flush the hot and cold supplies
(1) Remove the dust cover.
(2) Open the cold stop using a 4 mm Allen
wrench.
(3) Allow the cold supply to flush for at least five
minutes.
(4) Close the cold stop.
2.
1.
(1) Remove the flushing block using a 5 mm Allen
wrench. Turn it 90° and reinstall.
(2) Open the hot stop.
(3) Allow the hot supply to flush for at least 5
minutes.
(4) Close the hot stop.
2.
Installation
Close the stops using a 4 mm
Allen wrench.
Cut the plaster shield so that it extends ¹⁄₁₆" - ⅛"
from the finished wall surface.
4.
4.