Página 1
INSTRUCCIONES PARA LA INSTALACION DE LA GRIFERIA А А А INSTRUKCJE INSTALACJI ARMATURY Z95340 Zucchetti Rubinetteria S.p.A. Via Molini di Resiga, 29 - 28024 Gozzano (No) - Italy - Tel. +39 0322 954700 - Fax +39 0322 954823 - zucchettidesign.it...
Página 2
Z95340 INSTALLAZIONE / INSTALLATION MIN. 26 mm SE NECESSARIO IF NECESSARY MIN. 26 mm PIASTRELLA / TILE PIASTRELLA / TILE MAGNETE / MAGNET...
Página 4
Recommended temperat.: 60-65°C Zucchetti taps can be used with electric storage water heathers and instant gas types, centralised system, combi wall-mounted gas boilers and district heating systems. Before connecting the taps we recommend draining the system thoroughly; it is also advisable to install under basin stop valves with filter (art. Z9126P). Should the water pressure be higher than 5 bar, a pressure reducer should be fitted upstream of the supply pipes.