Descargar Imprimir esta página

ZONE KIZ 342-069V00 Manual De Instrucciones página 8

Publicidad

Idiomas disponibles

Idiomas disponibles

7. Install the upper frame tubes:
Prepare six frame tubes (7) . Connect the
six frame tubes (7) to the corresponding snap holes. The hook and loop fixed
at the top of the net is around the upper frame. Install the frame tube on the top
of the support tube and connect it to the corresponding position. Press the tube
down, ensuring the buckle and clip control correspond each other.

Publicidad

loading

Este manual también es adecuado para:

342-068v00