Descargar Imprimir esta página

MCS Master GREEN 310SG Manual De Instrucciones Para El Uso Y Mantenimiento página 47

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 33
AL
► the combustion chamber and heat ex-
BG
changer are sufficiently cooled and do not
overheat.
CN
WARNING !!!: Only hoses that are
CZ
suitable for continuous operation of
DE
at least 150
C (temporary allowable
o
temperature:180
DK
of first 2 meters, and at least 85
on the rest of the hose length should
EE
be attached to the heater. It is re-
commended to use MASTER brand
ES
hoses.
FI
WARNING !!!: It is possible to at-
FR
tach a special perforated hose made
of PE foil, however first use a special
GB
kit dedicated to each heater model
(fig. 3) You can purchase such kits
GR
at your nearest MASTER brand ven-
HR
dor.
HU
WARNING !!!: After connecting
the distributing hose, pay attention
IT
to its placement. In order to limit the
LT
air flow obstruction and device load,
we recommend to lay the hose so as
LV
to limit the number of bends to the
minimum. Moreover, do not bend the
NL
hose at angles less than 90°. Addi-
tionally, the initial 2 meters of the
NO
duct should not be bent (fig. 4).
PL
CONNECTION TO FLUE (fig. 5, 6, 7)
PT
Thermal effi ciency and proper functioning
are directly related to correct draft in the
RO
chimney.
► Make sure distance between heater and
RU
chimney is as short as possible, do not create
ciosed angles or chimney section reductions.
SE
► If the heater is not connected to an outside
SI
chimney, it must be equipped with a vertical
steel fl ue and a draft regulator.
SK
►►4. RUNNING THE HEATER
TR
TO START THE HEATER
► Set switch (2) on position "O", connect
UA
heater to mains (see model plate for electri-
cal specifi cations).
YU
C) on the section
o
► If the heater is to be run under manual
control, set switch (2) on position
ner will start and after a short time of com-
bustion chamber preheating the main venti-
lator will start.
► If the heater is to be run under automatic
control, set desired value on selected con-
trol, set switch (2) on position
C
o
will now start and stop automatically.
► If after these operations the heater does
not run properly, revert to chapter "OBSER-
VED FAULTS, POSSIBLE CAUSE REME-
DIES" and fi nd out reason of malfunction.
TO STOP HEATER
► In manual mode, set switch (2) on position
"O" or turn off control in automatic mode.
► Burner will stop and main ventilator will
stop later when combustion chamber has
cooled off.
WARNING !!!: Never pull plug to
stop heater. Never pull plug before
heater has stopped by it self.
VENTILATION
To run your heater as a ventilator only, set
switch (2) on position
►►5. MAINTENANCE
Troublefree running of your heater requires
regular maintenance. Unplug heater before
doing any maintenance work.
CLEANING OF COMBUSTLON CHAMBER
AND EXCHANGER
This operation must take place at least once
a year when the heating season is over. Ac-
cess to exchanger is made via two access
doors (one via air outlet, the other after re-
moval of the body panel opposite to the bur-
ner). Access to combustion chamber require
removal of burner. Soot and debris can be
removed with a vaccum cleaner.
CLEANING OF VENTILATOR
Clean ventilator with compressed air after re-
moval of aspiration grilles.
CLEANING THE BURNER
Please revert to your authorized dealer for
this operation which must be carried out in
the bur-
the heater
.

Publicidad

loading

Este manual también es adecuado para:

Green 470sgGreen 690sg