Descargar Imprimir esta página

Hitachi G 23UC Instrucciones De Manejo página 12

Ocultar thumbs Ver también para G 23UC:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 41
English
5. Replacing supply cord
If the replacement of the supply cord is necessary,
this has to be done by Hitachi Authorized Service
Center in order to avoid a safety hazard.
6. Maintenance of the motor
The motor unit winding is the very "heart" of the
power tool. Exercise due care to ensure the winding
does not become damaged and/or wet with oil or
water.
7. Service parts list
CAUTION
Repair, modification and inspection of Hitachi Power
Tools must be carried out by an Hitachi Authorized
Service Center.
This Parts List will be helpful if presented with the
tool to the Hitachi Authorized Service Center when
requesting repair or other maintenance.
In the operation and maintenance of power tools,
the safety regulations and standards prescribed in
each country must be observed.
MODIFICATIONS
Hitachi Power Tools are constantly being improved
and modified to incorporate the latest technological
advancements.
Accordingly, some parts may be changed without
prior notice.
GUARANTEE
We guarantee Hitachi Power Tools in accordance with
statutory/country specific regulation. This guarantee does
not cover defects or damage due to misuse, abuse, or
normal wear and tear. In case of complaint, please send
the Power Tool, undismantled, with the GUARANTEE
CERTIFICATE found at the end of this Handling
instruction, to a Hitachi Authorized Service Center.
NOTE
Due to HITACHI's continuing program of research and
development, the specifications herein are subject to
change without prior notice.
IMPORTANT
Correct connection of the plug
The wires of the main lead are coloured in accordance
with the following code:
Blue: -Neutral
Brown: -Live
As the colours of the wires in the main lead of this tool
may not correspond with the coloured markings
identifying the terminals in your plug proceed as follows:
The wire coloured blue must be connected to the terminal
marked with the letter N or coloured black. The wire
coloured brown must be connected to the terminal mark-
ed with the letter L or coloured red. Neither core must be
connected to the earth terminal.
NOTE
This requirement is provided according to BRITISH
STANDARD 2769: 1984.
Therefore, the letter code and colour code may not
be applicable to other markets except The United
Kingdom.
11
Information concerning airborne noise and vibration
The measured values were determined according to
EN60745 and declared in accordance with ISO 4871.
Measured A-weighted sound power level: 101 dB (A)
Measured A-weighted sound pressure level: 90 dB (A)
Uncertainty KpA: 3 dB (A).
Wear hearing protection.
Vibration total values (triax vector sum) determined
according to EN60745.
Surface grinding:
Vibration emission value
2
Uncertainty K = 1.5 m/s
The declared vibration total value has been measured in
accordance with a standard test method and may be used
for comparing one tool with another.
It may also be used in a preliminary assessment of
exposure.
WARNING
The vibration emission during actual use of the
power tool can differ from the declared total value
depending on the ways in which the tool is used.
Identify safety measures to protect the operator that
are based on an estimation of exposure in the
actual conditions of use (taking account of all parts
of the operating cycle such as the times when the
tool is switched off and when it is running idle in
addition to the trigger time).
Information about power supply system of nominal
voltage 230 V~
Under unfavorable mains conditions, this power tool may
cause transient voltage drops or interfering voltage
fluctuations .
This power tool is intended for the connection to a power
supply system with a maximum permissible system
impedance Z
of 0.23 Ohm at the interface point (power
MAX
service box) of the user's supply.
The user has to ensure that this power tool is connected
only to a power supply system which fulfills the
requirement above.
If necessary, the user can ask the public power supply
company for the system impedance at the interface
point.
a
2
= 6.5 m/s
h, AG

Publicidad

loading

Este manual también es adecuado para:

G 18uc