Installation (continued)
5
Attaching supply lines
□
Identify hot and cold water supply valves below
the sink. Connect and tighten the water supply
line nuts by using two adjustable wrenches
(avoid twisting or kinking).
Operation
1
Flushing and checking for leaks
□
Remove the spray head (B) from the faucet body (A).
□
Turn on the water supply.
□
Flush out any debris. Check for leaks.
□
Replace the spray head (B).
RED LINE
HOT
B
B
6
BLUE LINE
COLD
A
A