Installation Instructions; Before Beginning Installation; Tools And Materials Required - GE Reverse Osmosis GXRM10GBL Manual Del Propietario Y Instalación

Ocultar thumbs Ver también para Reverse Osmosis GXRM10GBL:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
Instructions
Questions? Call 800.GE.CARES (800.432.2737) or Visit our Website at: ge.com
BEFORE YOU BEGIN
Read these instructions completely
and carefully.
IMPORTANT
instructions for local inspector's use.
IMPORTANT
governing codes and ordinances.
• Note to Installer – Be sure to leave these
instructions with the Consumer.
• Note to Consumer – Keep these
instructions for future reference.
• Proper installation is the responsibility
of the installer.
• Product failure due to improper installation
is not covered under the Warranty.
• A shutoff valve must be available or added
near the installation point.
Reverse Osmosis Filtration System
— Save these
— Observe all
Model GXRM10GBL
TOOLS AND MATERIALS
REQUIRED FOR INSTALLATION
• Drill with 1-1/4" Drill Bit (type as required)
if mounting is needed for faucet
• Adjustable Open-End Wrenches
• Phillips and Flat Blade Screwdrivers
• Utility Knife
CONTENTS INCLUDED
WITH PRODUCT
• Reverse Osmosis Assembly and Tubing
• Product Literature (Owner's Manual and
Installation) and Performance Data Sheet
• Water Supply Inlet Parts Bag
• Drain Line Adapter
• Storage Tank
• Faucet
• Pipe Thread Tape
4

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

273-40r010-1900d215c1044p034

Tabla de contenido