Please check to make sure
that all of the following parts
listed are included in the box
when opened. If there are any
missing parts, please contact
Dream On Me before using
the product.
Operation and Installation of Play Yard
1. Place the product vertically and open the 3 velcro straps. See figure 1.
2. Unfold the folded mattress pad used for the floor of the play yard. See figure 2.
3. Draw the four corner posts outward in all 4 directions. Notice that the top rails on each side is bent, connected by a joint.
Straighten each side until it locks into place where you'll hear a clicking sound. If done correctly, the 2 adjacent rails
become one long rail. See figure 3.
4. Pull each corner in all 4 directions and push down on the middle bar in the center of the play yard towards the floor to
lock all sides into place. See figure 4.
5. Place mattress pad on the bottom of play yard with soft side facing up. See figure 5. Lift each end of mattress to insert
two hook-and-loop straps through button-hole openings on bottom of play yard and adhere underneath. Repeat for
opposite end. See figure 5A.
1
4
To Fold The Play Yard
6. After removing the mattress pad, pull up the belt located at the center of the play yard. See figure 6.
7. On the joint connecting the 2 top rails on each side, grasp it and feel for the locking mechanism underneath the
joint. Squeeze and release the locking mechanism and push downward. See figure 7.
8. Repeat step 7 for the other 3 joints. Then draw in the 4 corner posts. See figure 8.
9. Wrap the mattress pad around the play yard as it was when removed. See figure 9.
10. Finish wrapping the mattress pad with the 3 velcro straps. See figure 10.
6
Parts List
Frame 1pc
2
5
7
8
Mattress pad 1pc
3
5A
9
Carry bag 1pc
10