Descargar Imprimir esta página

Sime GO 18 BF G20 Manual De Uso, Instalación Y Mantenimiento página 83

Publicidad

Idiomas disponibles

Idiomas disponibles

EN
6.13.2 EMPTYING operations
Domestic hot water circuit:
– close the domestic hot water circuit isolation valve
(prearranged in installation)
– open one or more than one hot water valve to fill and bleed the
domestic hot water circuit.
Boiler:
– loosen the automatic bleed valve (3)
– close the heating circuit isolation valves (prearranged in
installation)
– check that the filling valve (4) is shut-off
– connect a rubber hose to the boiler drain valve (7) and open it
– when it has fully emptied, close the drain valve (7)
– close the automatic bleed valve (3).
4
3
7
Fig. 45
69

Publicidad

loading