Descargar Imprimir esta página

Palram Balance Instrucciones De Montaje página 2

Ocultar thumbs Ver también para Balance:

Publicidad

IMPORTANT
Please read
these
instructions carefully before you start to assemble this
greenhouse.
Keep
these
instructions
in
a
safe
place
for future
reference.
»
Customer Service
For
assistance
with
assembly or for replacement parts
-
please log
onto our website
or call our service line
(number
is
on
the
title
page).
Additional information
can be
found
at our website: www.palramapplications.com
»
Safety Advice
It
is
of utmost importance to
assemble
all
of the
parts according
to the directions.
Do
not
skip any step.
We
strongly recommend
using
work
gloves
during
assembly.
Always wear shoes and safety
goggles when working with extruded aluminium.
If using
a
step ladder or
power tools
ensure
that
you
follow the manufacturer's
safety
advice.
Do
not touch overhead power
cables
with the aluminium
profiles.
Do
not attempt to
assemble the greenhouse
in
windy
or
wet conditions.
Dispose
of
all
plastic
bags safely keep
them out of
reach
of
small
children.
Keep
children away from the assembly
area.
Do
not
lean
against or push the greenhouse during construction.
Do
not position your greenhouse
in an area
exposed to excessive wind.
Do
not attempt to
assemble this greenhouse
if
you
are
tired,
have
taken drugs
or alcohol or if you
are
prone to dizzy
spell.
Hot items
such
as
recently
used grills,
blowtorches
etc.
must not
be
stored
in
the
greenhouse.
Ensure
there
are no
hidden
pipes or cables
in
the ground before
inserting the
pegs.
This
product
is
designed to
use
as
greenhouse only.
»
Care &
Maintenance
When
your greenhouse
needs
to
be
cleaned,
use
a
mild detergent solution and
rinse
with
cold clean water.
DO NOT use
acetone, abrasive cleaners or
other
special
detergents to
clean
the
clear panels. It
is
recommended to check periodically that
roof
panels caps (plastic
part
329 &
profile
981) are set in place.
»
Tools
&
Equipment
Tape
measure
Work gloves
Lubricant
Phillips
head
screwdriver
Step
ladder
Drill
bit
Large
hammer
Spanner
T001
-
Special
tool for
Screws
411
and nuts 412
»
Before Assembly
This
is a
multi-part
assembly best achieved
by
two
people. Allow at least half
a
day
for
assembly
process.
Selecting
a
site
-
the greenhouse must
be
,
positioned
and fixed on
a
flat
level surface.
Choose
a
sunny position away from
overhanging
trees.
We are
strongly recomend to fix your
greenhouse directly to
a
solid concrete
foundation.
When
doing that
use
the
pre
drilled
holes
in
the metal
base
supplied.
Take
out
all
components
parts
of
the
packages. Sort
the parts and check against
the contents parts
list.
During assembly parts should
be laid
out
close at hand. Keep all small parts (screws
etc.)
in
a
bowl
so
they
do
not get
lost.
In
purpose to facilitate part's identification
and assembly process,
all-positioned profiles
are used
in
this greenhouse.
As
a
result some
apertures
in
the profiles
are
not
used
during
assembly.
»
During Assembly
Carry
out the assembly
steps
in
the order
set
out
in
the instructions.
You
may
use
Silicon
lubricant
spray in
order to
help you slide the profiles on the connectors.
Do
not
spray
the Polycarbonate
panels.
Use
the rubber malet if
necessary.
Step
3: Part 7063
is
the greenhouse
threshold. Fixing it determines the
front
side
of the
greenhouse.
Steps 10:
The oval
hole
in
the
crossbars A256
should always
be
assembled to the
base
of the
greenhouse.
Steps 24-39:
Part 7180
is
used
for assembly
assistance.
Steps 39: Remove
Part 7180 and discard.
Steps 55: Decide
on
the window's location
before assembly. Windows
can be
installed
in
two of
the indicated options.
Step 69:
In
case
the
window
is
not
closed
properly, please release the
screws,
adjust
the profile and
tighten the
screw.
Step 86: Firmly connect the greenhouse
to
a
level final
position immediately after
completion of the
assembly.
Tighten
all screws
when completing
assembly.
Screws
411
and nuts 412
are used
throughout
the assembly
process.
Screws
411
are
to
be
assembled from the outside and nuts 412
from the
inside
of
the
greenhouse.
If
not specified otherwise, do not fasten
screws and nuts
(411
&
412) more than
2-3
turns only.
Do
not tighten them until completion of the panels'assembly.
These
2
icons
indicate if screws'tightening
is
required
or not.
However,
in
some steps,
temporary tightening of
a
few
screws may be
needed to
prevent
a
profile from falling
till
it
will
be
fully connected
in
the next
steps.

Publicidad

loading