Descargar Imprimir esta página

Echo RM-3020T Manual De Instrucciones página 14

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Before you start
Installation of shield
Installing nylon line cutting head
 Crush the hook (D) attached to the hanger (E) of the
loop handle with a plier so that it does not come off.
1.
Fit shield (A) to mounting portion of angle transmission and
tighten 4 bolts (B).
1.
Insert locking tool (A) into a hole located on the right side of
angle transmission while forcing retainer spring to the left
side.
2.
Insert locking tool further into blade retainer fixing slot (B) to
fix output shaft.
3.
Using the socket wrench, remove the nut (C), cup (D), and
lower blade retainer (E).
 Nut, cup, and lower blade retainer are not used with a nylon
line cutting head.
 Fix output shaft securely using locking tool in order to
prevent it form rotating when nylon cutting head is
mounted.
4.
Thread nylon line cutting head (F) onto shaft (anticlockwise)
until it is tight.
5.
Remove locking tool.
12
CAUTION
CAUTION

Publicidad

loading