Descargar Imprimir esta página

Delta 5COM PAC Serie Manual página 4

Publicidad

Figure 1 - Access Requirements
40"
Figure 2 - Dimensional Drawing for Heavy Commercial Steam Generator
*Shown with optional
2nd control package
Operating
Sight
Glass
5½"
Assembly
AROMA 1 AROMA2
17"
AROMA 1
AROMA 2
WATER
Control Access
*Steam Outlet #2
Steam Outlet #1
¾" NPT
¾" NPT
Pressure
Control
80
60
40
20
psi
0
21"
30"
Steam Valves may be
rotated by loosening
this union
Auxiliary
Manual Reset
Pressure Cutoff
100
Pressure
120
140
Gage
Water Solenoid,
Valve ¼"
Water Inlet,
Strainer
½" NPT
1" Manual Drain
Valve
1" Optional Auto
Blowdown Valve
4
36"
15psi
Safety Valve
¾" NPT Outlet
CONTROL POWER
STEAM 1
STEAM 2
Heater
Access
ASME
Data Plate
ASME Plate
Located Inside
24KW
208V
12½"
19"
Power Switch
Steam Solenoid
Switches (Shown
with optional 2nd
control package)
Drain Outlet
6⅜"
2⅜"
114415 Rev. F

Publicidad

loading