PRESSURE GAUGE
A pressure reading gauge is
present on the control panel.
Yellow sector: minimum/medium
pressure.
Green sector: medium/maximum
pressure.
Orange sector: maximum
pressure.
Red sector: Over-pressure
Open the latch of the hose inlet, on the machine front, and connect the
hose making sure that it is properly connected (Fig. 13).
Insert and connect the other end of the hose in the vacuum inlet (Fig. 14).
To move the machine push from backward as shown in (Fig. 15).
(Fig. 13)
FIRST FILL-UP
If the boiler and water tank are completely empty, all system functions
are disabled.
Ensure there is water in the tank, and manually fill if empty.
With the tank full and the boiler empty, after feeding the generator through
the switches (see the "PREPARATION" paragraph), the system controls
the water filling pump until the correct level is reached in the boiler. In this
phase the heater is deactivated. Once filling is completed, the pump is
turned off, and heating is simultaneously enabled through the boiler heater.
Discharge any residual air from the boiler during the heating stage, by
pressing switch 2 (Fig. 20) and pressing the steam delivery button 1 (Fig.
20). This operation is important, given the power of the generator to prevent
excessive rise in pressure.
14
(Fig. 14)
(Fig. 12)
(Fig. 15)