Descargar Imprimir esta página

GE AEH25 Manual Del Propietario Y Instrucciones De Instalación página 13

Publicidad

Idiomas disponibles

Idiomas disponibles

Through-the-Wall
Installation Instructions--Optional
The case may be installed
through-the-wall
in both existing
and new construction.
Read completely,
then
follow
step-by-step.
NOTE: Obtain
all materials
locally for
mounting
the air conditioner
through-
the-wall.
ITI IMPORTANT
(cont.)
F_ Secure with 14 wood screws
anchored
at
least an inch into the wall support
structure.
NOTE: Drill pilot holes, if necessary,
for
proper
installation.
If the frame
is oversized,
use shims to prevent
case distortion.
%
@
IMPORTANT
Through-the-wall
installation
is not
appropriate
if any of the side or top louvers
in the case will be obstructed
by the wall.
All side and top louvers in the case must
project on the outdoor side of the wall.
The room side of the case must project
into the room far enough to maximize
the
balance of the unit.
The case must be installed level from side-
to-side and with a slight tilt from front to
rear. Use a level; no more than a 1/2 bubble
will be the correct case slant to the outside.
Lintel angle is required to support
bricks or
blocks above opening.
Flashing is required and should extend the
length of the opening to ensure no inside
cavity leakage occurs.
Remove
the air conditioner
from the case.
For specific
instruction,
refer to the Window
Installation
Instructions.
Make certain
that a wall receptacle
is
available
close to the hole location
or make
arrangements
to install a receptacle.
Place the case in the wall opening
and
place wood support
strips
between
the case
bottom
and the flashing
on both sides of the
bottom
rail. They should
be the same height
as the bottom
rail and the same length
as
the wall openin.q.
13
[] FINISH THE WALL OPENING
[]
Caulk all four sides on the outdoor
side of
the case to prevent
moisture
from getting
through
to the interior
wall. Use of flashing
(drip rail) will further
prevent
water from
dripping
inside the wall and down
the
outside
of the building.
Caulking
[_
Plaster line
rl
Trim molding (if
I I """
desired)
OUTSIDE
Air louvers (top /
and sides must/
project on thev
outdoor side of
the wall)
INSIDE
Bottom rail
J
Wood filler and
caulking (above an
below the flashinc
Flashing
(Drip rail)
Bottom
rail
Flashing
(Drip rail)
Wood support strips
F_ Place the air conditioner
into the case.
For specific
instruction,
refer to the Window
Installation
Instructions.

Publicidad

loading