IMPORTANT
Please read
these
instructions carefully before you start to assemble this product
.
Please
carry
out
the
steps in
the order
set
out
in
these
instructions.
Keep
these
instructions
in
a
safe
place
for future
reference.
Safety advice
For
safety purposes we
strongly recommend the product to
be
assembled by at least
two
people.
Be
sure
to check that there
are no
hidden
pipes or cables
in
the wall before drilling.
Some parts may have sharp edges.
Please be
careful when handling components. Always wear
gloves,
eye
protection,
and long
sleeves
when assembling or performing any maintenance
on
your product.
Do
not
attempt
to assemble the product
in
windy or wet conditions.
Do
not
attempt
to assemble the product if you
are
tired,
have
taken drugs,
medications or alcohol, or if you
are
prone to dizzy
spells.
Dispose
of
all
plastic
bags safely
-
keep
them
away
from children's
reach.
Keep
children
away
from the assembly
area.
When using
a
stepladder or power tools, make
sure
that
you
are
following
the manufacturer's
safety advice.
Do
not climb or stand on the
roof.
Do
not hang or
lay
on the profiles.
Heavy articles should not
be
leaned against the poles.
If
color
was
scratched
during
assembly it
can be
fixed.
Cleaning
instructions
In
order to
clean
the product,
use
a
mild detergent solution and
rinse
with
cold clean water.
Do
not
use
acetone, abrasive cleaners, or
other
special
detergents to
clean
the
panels.
Clean
the product once assembly
is
complete.
Before
starting
assembly
Choose
your
site
carefully before beginning
assembly.
The
ground
surface must be
perfectly flat
and leveled and
have
a
solid
base such
as
concrete, asphalt, deck
etc.
Sort the parts and check against
the content
parts
list.
Parts
should
be
laid
out
close at hand. Keep
all
small parts (screws etc.) in
a
bowl
so
they
do not get
lost.
Please
consult your
local
authorities if
any
permits
are
required prior to constructing the
product.
During Assembly
When
encountering the information
icon, please refer
to the relevant
assembly step for additional comments and assistance.
Steps
Step
1: Please
choose the SideWall's
installation
side,
left
or
right.
Lay
on
the ground and
pay close
attention
to the directions.
It
is
recommended to
place
a
sheet
/
Carton below the parts to avoid scratches and
peeling of paint.
Step 17:
Please
do not cut profile
8630
unless needed.
Step 20:
Please
do not cut profile
8699
unless needed.
Step 22:
Please
do not cut profile
8676
unless needed.
Step 23:
Please
do not cut the Acrylic sheets
8687
&
8688
unless needed, all
precautions must
be
taken.
Step 24:
Please
do not cut profile
8698
unless needed.
Step
26+27:
Install the sealing strip on the
outer
side,
as
shown
in
the diagram.
Note:
Anchoring this product to the ground
is
essential to
its
stability
and rigidity.
It
is
required to complete this stage
in
order for your warranty to
be
valid.