Descargar Imprimir esta página

Palram Harmony 6x14 Manual De Instrucciones página 10

Ocultar thumbs Ver también para Harmony 6x14:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 15
During Assembly
Make sure
the
base
is
square by measuring
the diagonals and
level by using
a
spirit
level.
You
may
use
silicone lubricant spray
in
order to help you
slide
the panels into the profiles.
Do
not spray the polycarbonate
panels.
Use
a
rubber mallet if
necessary.
All panels
with the stamped words
"THIS
SIDE
OUT"
must
be
facing out to create
full
UV
protection.
Remove plastic sticker
as
panels are locked
in
place.
Steps
13, 17, 24, 32, 33, 35, 46, 47, 50, 51, 52, 54,
61:
Please Note!
Each
of the
3
greenhouses come
with
its
compatible
panels kit
as
shown
in
the
content
list and
in
the relevant assembly
steps.
When
encountering the information
icon, please refer to the relevant
assembly step for additional comments and
assistance.
This icon
indicates
that the installer should
be
inside the product.
This
icon indicates
that
the installer should
be
outside the product.
Attention
During assembly
use
a
soft surface below the parts to avoid scratches and damages.
Steps
Step
3: Make sure
the
base
is
square by measuring the diagonals and level by using
a
spirit
level.
Step 6:
Part
994, 995
are in
the back of the greenhouse. Attaching them determines the
front
side
of
the greenhouse.
Steps
9, 12, 16: The oval hole
in
the
crossbars 256 should always
be
assembled to the
base
of
the
greenhouse.
Door Assembly
Step 10: Determines door direction.
Part
987
is
the
side
that the door
hinges will
be
located. The
door
can be
installed either
as
a
left or right hand door.
These
instructions show
a
right
hand
door
assembly.
Steps
61-66: Door assembly should
be
done according to this decision.
Window Assembly
Step 43: Decide on the window's location before assembly. Window
can be
installed
in
one of the
indicated options.
Step 59:
If
the
window
doesn't
close
properly,
please release
the
screws,
adjust the profile
and
re-tighten the
screws.
* Please
tighten
all screws
when completing assembly.
Screws
411
and nuts
412
&
466
are used
thruoghout
the assembly
process.
Screws
411
are
to
be
assembled from the outside and nuts 412
&
466
from the inside of
the greenhouse.
Do
not fasten screws and nuts (411,412
&
466) more
than
2-3
turns only.
Do
not
tighten
them until completion of the panels'assembly, if not specified otherwise.
However,
in
some
steps,
temporary tightening of
a
few
screws may
be
needed to
prevent
a
profile from falling.
Note:
Firmly connect t
e
product to
a
eve surface
immediately after completion of the
assembly.
Anchoring this product to the ground
is
essential to
its
stability
and rigidity.
It
is
required
to complete this
stage
in
order for your warranty to
be
valid.

Publicidad

loading

Este manual también es adecuado para:

Mythos 6x14Hybrid 6x14