Descargar Imprimir esta página

GE AEW10 Serie Manual Del Propietario E Instrucciones De Instalación página 9

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
Instructions
D WINDOW
REQUIREMENTS
•These instructions are for a standard double-hung
window. You will need to modify them for other types
of windows.
• The air conditioner can be installed without the
accordion panels if needed to fit in a narrow
window. See the window opening dimensions.
• All supporting parts must be secured
to firm wood, masonry or metal.
• The electrical outlet must be within reach of the
power cord.
m
t"
1
//J
B===8
15 1/2"min.
22" to 36"
(With accordion panels)
I
I
STORM WINDOW
REQUIREMENTS
A storm window frame will not allow the air
conditioner to tilt toward the outside, and will keep it
from draining properly.
To adjust for this, attach a piece of wood to the sill.
WOOD PIECES
WIDTH: 2"
LENGTH: Long enough to fit inside the window
frame.
THICKNESS: To determine
the thickness,
place a
piece of wood on the sill to make it 1/2" higher than
the top of the storm window
frame or the vinyl
frame.
Attach securely with nails or screws provided by the
installer.
1/2" higher
than vinyl frame
1/2,,higher
_
; (°n s°me wind°ws) ./,-Wood
-rr;
!)) j_ j)/I
than storm
_--
n$l:
IJ,,=Y(_I
window
frame
_
Sill
r_
Storm window
frame
-
r_
Vinyl frame
I I
D PREPARE THE AIR CONDITIONER
r_
Hold the accordion
panel in one hand and
gently pull back to free the open end.
Slide the free end of the accordion
panel into
the side panel rails. Slide the panel down. Be
sure to leave enough space to slip the top
and bottom
of the frame into the rails on the
cabinet.
NOTE: There is a right and a left accordion
panel. Be sure to use the proper panel for each
side.
FC] Slide the left and right accordion
panels into
the top and bottom
mounting
roils.
Top mounting
rail
Top right
Top,_t
_/
i_
Bottom
mounting
rail
9

Publicidad

loading

Este manual también es adecuado para:

Aez10 serieAew12 serieAez12 serie