ASSEMBLY INSTRUCTIONS
4. Back to back installation
If the hot and cold inlets are reversed (hot on right
and cold on left), remove the screw (I), inverter (J),
and bonnet (K) from the valve body (D) with reversed
supply connections. Rotate the cartridge (L) 180°,
so H appears on the right. Install the cartridge making
sure that the key is fully engaged with the slot in the
valve body (D). Slide the bonnet (K) over the cartridge
(L) and thread them onto the valve body (D). Hand
tighten securely. Reassemble the inverter (J) and
screw (I). If you are not making a reverse or back to
back installation, skip this step and continue with the
step 5.
NOTE: Never install the valve body (D) upside down!
5. Flushing:
a. Attach the handle assembly (F) by threading the
base of the handle assembly (F) onto the valve
body (D) and twisting clockwise until secure.
b. Turn the handle assembly (F) to the on position.
Turn on the hot and cold water supply lines and
allow the water to flow from the outlets for one
minute, or until all foreign matter has been
flushed out. Check for leaks.
c. Shut off the water at the faucet and supply lines.
Remove the handle assembly (F).
6. Place the plaster guard (I) onto the body (D) and
secure with the screws (J).
4
Reverse
Installation
L
Cold
Reverse Installation
5
D
6
J
5
Cold
D
Hot
K
Hot
Hot
H
Normal Installation
H
D
D
I
Normal
Installation
(changes
not
required)
Cold