Descargar Imprimir esta página

Palram Essence 8x12 Instrucciones De Montaje página 2

Ocultar thumbs Ver también para Essence 8x12:

Publicidad

IMPORTANT
Please read
these instructions carefully before you start to assemble this greenhouse.
Keep
these instructions
in
a
safe
place for
future
reference.
Customer
Service
For
assistance
with
assembly or for replacement parts
-
please log
onto our website
or
call
our service line (number
is
on
the title
page).
Additional information
can be
found
at
our website:
www.palramapplications.com
Safety Advice
It
is
of utmost importance
to assemble
all
of the
parts
according to the directions.
Do
not
skip any step.
We
strongly recommend
using
work
gloves
during
assembly.
Always wear shoes and safety
goggles when working with extruded aluminium.
If
using
a
step ladder or
power tools
ensure
that
you
follow the manufacturer's
safety advice.
Do
not touch overhead power
cables
with the aluminium
profiles.
Do
not attempt to
assemble
the greenhouse
in
windy
or
wet conditions.
Dispose
of
all
plastic bags safely keep
them out of
reach
of
small
children.
Keep
children away from the assembly
area.
Do
not
lean
against or push
the greenhouse during construction.
Do
not position your greenhouse
in an area
exposed to excessive wind.
Do
not attempt to
assemble this greenhouse if you
are
tired, have taken drugs
or alcohol or if you
are
prone to dizzy
spell.
Hot items
such
as
recently
used grills,
blowtorches
etc.
must
not
be stored
in
the
greenhouse.
Ensure
there
are
no
hidden
pipes or cables
in
the ground before
inserting the
pegs.
This
product
is
designed to
use
as
greenhouse
only.
Care &
Maintenance
When your greenhouse needs to be cleaned,
use
a
mild detergent solution and rinse with
cold clean water.
DO NOT use
acetone, abrasive cleaners or
other
special
detergents to
clean
the
clear panels.
It
is
recommended to check periodically that
roof
panels caps (plastic part 329
&
profile
981) are set
in
place.
Tools
&
Equipment
Tape
measure
Work gloves
Lubricant
Phillips head screwdriver
Step ladder
Drill
bit
Large
hammer
Spanner
T001
-
Special
tool for
Screws
411
and nuts 412
Before
Assembly
This
is
a
multi-part
assembly best achieved
by
two
people. Allow
at least
half
a
day for
assembly
process.
Selecting
a
site
-
the greenhouse must
be
,
positioned
and fixed on
a
flat
level surface.
Choose
a
sunny position away from
overhanging
trees.
We are
strongly recomend to fix your
greenhouse directly to
a
solid
concrete
foundation.
When doing that
use
the
pre
drilled
holes
in
the
metal
base
supplied.
Take
out
all
components
parts of the
packages. Sort
the
parts and check against
the
contents
parts
list.
During assembly parts should
be laid
out
close
at hand. Keep
all
small parts (screws etc.)
in
a
bowl
so
they do not get
lost.
In
purpose to facilitate parts' identification
and assembly process,
all-positioned profiles
are
used
in
this greenhouse.
As
a
result some
apertures
in
the
profiles
are
not
used
during
assembly.
A
A'
A.
SA.
A'S
A.
SS
Ile
-
-
-51
.
-
During Assembly
Carry
out the
assembly steps
in
the order
set
out
in
the instructions.
You
may
use
Silicon
lubricant
spray
in
order to
help you slide the profiles
on
the connectors.
Do
not
spray
the Polycarbonate
panels.
Use
the rubber malet
if necessary.
Step
6: Make
sure
the
base
is
square
by
measuring the diagonals and
level
by
using
a
spirit
level.
Step
3:
Part
7063
is
the greenhouse threshold.
Fixing
it
determines the front
side
of the
greenhouse.
Steps
8
+9,11,14,16,19:
The
oval
hole
in
the
crossbars
A256 should always be assembled
to
the
base
of the
greenhouse.
Steps 22-37:
Part
7180
is
used
for assembly
assistance.
Steps 37:
Remove
Part
7180 and discard.
Steps 53: Decide
on
the windows' location
before
assembly.
Windows
can be
installed
in
two of the indicated options.
Step 67:
In
case
the
window
is
not closed
properly, please release the screws, adjust
the
profile
and
tighten the
screw.
Step 85:
Firmly
connect the greenhouse
to
a
level final
position immediately after
completion of the
assembly.
Tighten
all
screws
when completing
assembly.
SA.
SA.
.
-
'
'
IS
.
'
-
.
.
-
II"'
"'"'S"'S
-

Publicidad

loading