Descargar Imprimir esta página

Goodwe GMK120 Guía De Instalación Rápida página 108

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 29
07
Commissioning
Power ON
Step 1 Connect the smart meter cables.
Step 2 Turn on the breaker on the voltage input side. Then the smart meter is powered on.
Indicator
Type
(Only for GMK360)
Reset Button
Press Time
≥5s
Status
Description
Steady on
Power on, no RS485 communication.
Blinking
Power on, RS485 communication works properly.
Off
Power off.
Off
Reserved.
Steady on
Purchasing from the utility grid.
Blinking
Selling to the utility grid.
Off
No purchasing or selling.
Steady on
Purchasing from the utility grid.
Blinking
Selling to the utility grid.
Off
No purchasing or selling.
Description
Reset the smart meter.
Quick Installation Guide V1.0 -2022 -11-30
106

Publicidad

loading

Este manual también es adecuado para:

Gmk330Gmk360Gm330