Kongskilde MULTIAIR FC 3000 Manual Del Operador página 4

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

1
7 - the terminal nuts and washers are removed, and all
cables attached as indicated. Washers and nuts are
re-installed and fastened securely. The ground wire is
connected as shown.
8 - the final connection should now look like this. Tight-
en the cable relief and re-install the connection box lid.
9 - tighten the cable relief for power supply and ther-
mistor cables.
4
2
3
10 - install the potential equalizing cable, and tighten
the nut securely (the right terminal is for grounding to
the plant).
Reinstall the upper panel with the 4 screws. It can be
necessary to press the side panels slightly, to align the
screw holes.
Reconnect the drain hoses and refit the blower covers.
11 - power supply to the control box is guided through
the relief union as indicated.
12 - power supply cable is connected to the main
switch as indicated. Finally the potential equalizing
cable and thermistor cable are connected.

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido